Saturday, March 15, 2014

She explained that during the passage of a train 488 passengers Tanta / Sherbin between Bella / Oba


"Railway" monitor bosch classixx 10 cases storming crossings bosch classixx and theft lines within 24 hours
She explained that during the passage of a train 488 passengers Tanta / Sherbin between Bella / Obashan by one anonymous open wrap the danger of one of the carriages, which led to train delays for unseasoned 20 minutes, and the passage of a train 8 Express Alexandria / Cairo Tacher the driver to open the wrapping danger in knowing unknown, which led to The train was delayed for unseasoned 7 minutes. And Oahart that the train driver No. 163 Express Aswan / Alex said that one anonymous open wrap the danger of one of the carriages, which led to train delays for unseasoned 15 minutes, and during during parking Train 915 Mkiv Cairo / Alexandria station Tanta by Anonymous shut down the carrot bosch classixx of air between bosch classixx Arabtan than led to train delays bosch classixx for unseasoned 9 minutes, and when also during the passage of a train 25 Express Cairo / Alexandria between Abu Homos / lab Kazaz has one anonymous open wrap threat bosch classixx to one of the carriages, which led to train delays for unseasoned 10 minutes, and another case when he told the train driver bosch classixx 518 Alexandria tourist bosch classixx / Mansoura officials that one anonymous open wrap danger to one of the carriages, which led to train delays for unseasoned 12 minutes. bosch classixx
The storming of level crossings at 20:00 informed the sentry port communicable between Raswa / port that when the closure of the port for the passage of a train 962 breeched a motorcycle without plates port from the eastern side, which led to Warp Aldilfah, fled were filed and installation of tracks and at 22:30 was ready Baldilfah most serious professionals.
The thefts at 16:20 Tacher of inspector Aldirich that when they walk between Alemrazik / Mziguna notes theft screws from km 200/40 to km 200/41 line-fated were the dangers of specialists and hung fortune bosch classixx in his time was running the line downward Single bosch classixx and at 2.15 has been locked rail after installation of 3,000 of the total 7,000 nail nail was Messier train speed of 30 km / h, and those reasons have led to delays in train number 14.
Warning: Invalid argument supplied for foreach () in / home / egyptvoi / public_html / wp-content / plugins / facebook-like-and-comment / comments.php on line 21 Warning: file_put_contents (/ home/egyptvoi/public_html/wp- content/fb-comment-cache/wp_293863) [function.file-put-contents]: failed to open stream: Permission denied in / home / egyptvoi / public_html / wp-content / plugins / facebook-like-and-comment / comments . php on line 34
Design and development company Fahd Internet Solutions

No comments:

Post a Comment